DeltaP Engenharia

Thermal Comfort and Air Quality

HVAC and Ventilation

Project for air conditioning, ventilation and exhaust for commerce, industry and public buildings, with thermal load calculation and PMOC for systems in operation.

  • ABNT NBR 16401
  • Cooling load for each room
  • PMOC with ART
  • Specification not linked to the manufacturer
HVAC, ventilation, exhaust and PMOC projects
20+
HVAC, ventilation, exhaust and PMOC projects
cooling load calculated throughout the day to define capacity
Hour by hour
cooling load calculated throughout the day to define capacity
typical time after receipt of the floor plans
2 to 4 weeks
typical time after receipt of the floor plans

About this service

We design air conditioning, ventilation and exhaust systems for supermarkets, stores, commercial rooms, industries and public buildings. The starting point is the thermal load calculation of the environment, with occupancy, lighting, equipment and enclosure, which defines the capacity of the equipment without overdimensioning.

The project delivers equipment layout, ducts, refrigerant lines, drains and electrical points, with a materials list and specification for purchase and installation. For systems in operation, we prepare the PMOC required by Law 13.589/2018 and by Portaria 3.523/1998.

Recent projects include the air conditioning of a new supermarket, a municipal events center, and industrial ventilation and exhaust systems.

Consequences of air conditioning without a design

Equipment chosen by an estimate of BTU per square meter leads to these problems.

  • Space that does not cool down

    Occupancy, lighting, display cases, ovens and solar gain vary throughout the day. Without a calculation, capacity falls short exactly at peak hours.

  • High energy bill

    Oversized equipment cycles on and off constantly, uses more energy and controls humidity poorly.

  • Stale air

    Without air renewal in accordance with NBR 16401, the space accumulates CO2 and odors, which affects customers and employees.

  • Missing PMOC

    A space for collective use without a PMOC does not comply with Lei 13.589/2018 and is subject to fines from the health authority.

When to hire

  • New or renovated store, supermarket or office
  • Space that does not reach the set temperature at peak hours
  • Industrial plant with heat, smoke or steam to remove
  • Space for collective use that requires a PMOC

What is included

  • Thermal load
  • Air Conditioning
  • Ventilation and exhaust
  • Ducts and lines
  • PMOC
  • Equipment specification

What you receive

  • Cooling load calculation for each room
  • Layout of equipment, ductwork, refrigerant lines and drains
  • Bill of materials and specification for quotes
  • PMOC and ART, when contracted

Completed work

Designs, site inspections and construction

4 images of DeltaP work. Tap an image to enlarge it.

Benefits

  • Defined capacity by calculation, not by estimation
  • Ready-to-buy and install project
  • Ducts and lines compatible with the structure and layout
  • Air quality according to NBR 16401
  • PMOC for regularization of existing systems

Why DeltaP

  • Calculated thermal load for each environment
  • Layout compatible with the steel structure, when our structural design is involved
  • Specification not linked to the manufacturer
  • PMOC prepared by an engineer, with ART
  • Assistance to municipalities and public agencies

Each project has its particularities

Talk to an engineer and find out how we apply this to your case.

Applications

  • Supermarkets and stores
  • Industries and production areas
  • Event centers and public buildings
  • Commercial and office spaces
  • Existing systems that require PMOC

How we work

  1. 1

    Survey

    Floor plans, use of spaces, occupancy, and equipment

  2. 2

    Thermal load

    Calculation per environment and definition of capacity

  3. 3

    Design

    Layout, ducts, lines, and equipment specification

  4. 4

    Emission

    Material list, memorandum, and ART

  5. 5

    Support

    Clarifications to the installer and, when contracted, PMOC

Frequently Asked Questions

If your question is not answered here, send a message with photos of the case. An engineer will reply.

Chat on WhatsApp

Do you install the system?

No. We deliver the project and the specification; the installation is carried out by an installation company, with our technical support.

What is the PMOC and who needs it?

It is the Maintenance, Operation and Control Plan required for air conditioning systems in collective use environments. We prepare the plan and the ART.

What is the project timeline?

Commercial projects take between two and four weeks after receiving the drawings.

What Our Clients Say

Rating 5.0 ⭐ based on 22 testimonials on Google

"Empresa confiável, profissionais atentos e competentes, recomendo!"

Sara Silva Lima

11 meses atrás • Google Maps

3 of 3

Would you like to leave a testimonial? Visit our page on Google Maps and share your experience with us!

Do you need this service?

Send photos and the location. We reply with scope, schedule and price.