DeltaP Engenharia

Technical reports

Reports and Expert Assessments

Structural inspection reports, NR-13 pressure vessel inspection reports, machine NR-12 compliance, expert assessments and technical opinions, with ART.

  • NR-12, NR-13 and NBR 16747
  • Ultrasonic testing and hydrostatic test
  • Court-appointed and party-appointed experts
  • ART
technical reports, expert assessments and inspections issued
75+
technical reports, expert assessments and inspections issued
typical time to issue the report after the site inspection
1 to 3 weeks
typical time to issue the report after the site inspection
with hydrostatic test and ultrasonic thickness measurement
NR-13
with hydrostatic test and ultrasonic thickness measurement

About this service

We issue technical reports with on-site inspection, photographic records tied to location, and an objective conclusion: what was observed, what it means, and what should be done. Parts without access, tests not performed, and information received from third parties are declared as caveat.

The most frequent reports are structural inspections of industrial sheds, roofs, and mezzanines; structural reports for photovoltaic panels; pressure vessel and compressor reports according to NR-13, with hydrostatic testing and ultrasonic thickness measurement when applicable; and machine adequacy reports to NR-12.

In judicial and non-judicial investigations, we act as expert or technical assistant, issuing a written report for the process and clarifications in court when necessary.

When a missing report becomes a problem

The requirement usually comes up at a bad time: an inspection, an insurance claim or a lawsuit.

  • Pressure vessel without a record file

    A compressor and receiver without an up-to-date NR-13 inspection are subject to shutdown, and the insurer may deny coverage in case of an accident.

  • Unguarded machine

    A machine not brought into compliance with NR-12 is a frequent cause of fines and of lost-time accidents.

  • Insurance claim without technical evidence

    After a windstorm, fire or collapse, the indemnity depends on a technical report describing the cause and extent of the damage.

  • Lawsuit without a party-appointed expert

    In a court-ordered expert assessment, a party without a party-appointed technical expert cannot submit questions or challenge the court-appointed expert's report.

When to hire

  • Periodic inspection of compressors and pressure vessels (NR-13)
  • Bringing machines and guards into compliance with NR-12
  • Structural inspection for insurance, sale, permitting or change of use
  • Insurance claims: windstorm, fire, impact, collapse
  • Court-ordered expert assessment or technical assistance in a lawsuit

What is included

  • Structural inspection
  • Pressure vessels (NR-13)
  • Machine protections (NR-12)
  • Expert assessment and technical assistance
  • Photovoltaic panels
  • Technical opinions

What you receive

  • Technical report with findings, conclusion, caveats and ART
  • Photo record with locations
  • Thickness measurement and hydrostatic test results, when applicable
  • Recommendations with priority and deadline

Completed work

Designs, site inspections and construction

6 images of DeltaP work. Tap an image to enlarge it.

Benefits

  • On-site inspection with photographic records tied to location
  • Objective conclusion and declared caveats
  • Thickness measurement and hydrostatic test when applicable
  • Document prepared for insurance, audit, and inspection
  • Technical responsibility in ART

Why DeltaP

  • Inspección realizada por ingeniero, con instrumentos
  • Cada ocurrencia fotografiada y localizada en el dibujo
  • Resalvas y limitaciones escritas en el informe
  • Informes NR-13 con prueba hidrostática y medición de espesor
  • Plazo informado en la propuesta

Each project has its particularities

Talk to an engineer and find out how we apply this to your case.

Applications

  • Galpones, cubiertas y mezaninos existentes
  • Cubiertas que recibirán paneles fotovoltaicos
  • Compresores, tanques y vasos de presión
  • Máquinas y líneas de producción (NR-12)
  • Procesos judiciales y siniestros

How we work

  1. 1

    Request

    Objective of the technical report, recipient, and existing documentation

  2. 2

    Inspection

    Technical visit with measurements, tests, and photographic documentation

  3. 3

    Analysis

    Verification, calculation when necessary, and comparison with applicable norm

  4. 4

    Report

    Drafting with findings, conclusion, caveats, and ART

  5. 5

    Delivery

    Presentation to the client and clarification to the recipient

Frequently Asked Questions

If your question is not answered here, send a message with photos of the case. An engineer will reply.

Chat on WhatsApp

How long does a technical report take?

Inspection and NR-13 technical reports typically take between one and three weeks after the inspection, depending on the extent. The deadline is communicated in the proposal.

Is the technical report valid for insurance and inspection?

The technical report is prepared according to applicable norms and signed with ART. Each institution may have specific format requirements; therefore, we confirm the recipient before the inspection.

Do you perform hydrostatic testing?

Yes, for pressure vessels and compressors within the scope of NR-13, with ultrasonic thickness measurement when applicable.

What do I need to send for an estimate?

Photos, location, what prompted the request, and, if applicable, a project or previous technical reports.

What Our Clients Say

Rating 5.0 ⭐ based on 22 testimonials on Google

"Empresa confiável, profissionais atentos e competentes, recomendo!"

Sara Silva Lima

11 meses atrás • Google Maps

3 of 3

Would you like to leave a testimonial? Visit our page on Google Maps and share your experience with us!

Do you need this service?

Send photos and the location. We reply with scope, schedule and price.