DeltaP Engenharia

Area Útil sem Ampliar a Construção

Steel Mezzanines

Design of steel mezzanines for storage, production and offices, with composite steel deck slab, wall panel or steel flooring, and verification of the existing structure.

  • ABNT NBR 8800 and NBR 6120
  • Existing floor slab checked
  • Escadas e guarda-corpos
  • ART
mezzanines and platforms designed since 2014
135+
mezzanines and platforms designed since 2014
typical time, from site measurement to issue of construction drawings
2 to 4 weeks
typical time, from site measurement to issue of construction drawings
composite slab with steel deck, wall panel or steel floor
3 floor types
composite slab with steel deck, wall panel or steel floor

About this service

A mezanino utilizes the clear height of the industrial shed to create storage, production, or office areas without expanding the building. The project defines the load usage, sizes beams, columns, and bracing according to NBR 8800 and selects the appropriate floor: mixed floor with steel deck, wall panel or metallic floor.

Before designing, we verify the capacity of the existing floor and structure to receive the new columns and loads, and we compatibilize the mezanino with equipment, circulation, and exits.

The deliverable includes stairs, guardrails, and access points, with fabrication and assembly drawings and a material list.

Common mistakes in mezzanines

A mezzanine bought by the square meter, without a design, usually runs into these issues.

  • Column on a weak floor slab

    A column concentrates load on a small area. An unreinforced building slab or one on poor fill cracks and settles.

  • Live load taken from a table

    Storage, archives and machinery have very different loads. The live load has to come from the actual use and be posted on site.

  • Vibration

    A beam sized only for strength can vibrate under foot and forklift traffic, which is uncomfortable and damages the floor.

  • Improvised stairs and guardrails

    Step height, width and guardrails outside the standard cause accidents and citations from inspectors.

When to hire

  • Lack of space for storage, production or offices inside the building
  • Platform for equipment such as compressors and machinery
  • Change of use of an existing mezzanine, with a higher load
  • Steel deck slab in a new building or expansion

What is included

  • Structural design
  • Laje mista ou steel deck
  • Steel flooring or wall panel
  • Verificação do existente
  • Escadas e guarda-corpos
  • Material list

What you receive

  • Calculation report with the defined live load
  • Fabrication and erection drawings for beams, columns and bracing
  • Details of the floor, stairs, guardrails and base plates
  • Bill of materials and ART

Completed work

Designs, site inspections and construction

6 images of DeltaP work. Tap an image to enlarge it.

Benefits

  • Load defined by actual use, not by a generic table
  • Floor chosen according to load, deadline and cost
  • Existing structure verified before installation
  • Stairs and guardrails according to applicable norms
  • Drawings ready for fabrication and assembly

Why DeltaP

  • More than 130 mezzanines and platforms designed since 2014
  • Verification of existing floor and structure before the project
  • Compatibility with layout, equipment, and circulation
  • Detailing of stairs, guardrails, and connections
  • Technical responsibility in ART

Each project has its particularities

Talk to an engineer and find out how we apply this to your case.

Applications

  • Storage and inventory in industrial sheds
  • Offices and administrative areas within the factory
  • Platforms for equipment
  • Production and assembly areas
  • Shops and commerce

How we work

  1. 1

    Survey

    Measurement of space, ceiling height, floor, and existing structure; use and predicted loads

  2. 2

    Conceptual design

    Modulation of columns, type of floor, and position of stairs

  3. 3

    Executive design

    Calculation, fabrication drawings, and assembly and material list

  4. 4

    Emission

    Internal conference and ART

  5. 5

    Assembly

    Clarifications to fabrication and supervision, when contracted

Frequently Asked Questions

If your question is not answered here, send a message with photos of the case. An engineer will reply.

Chat on WhatsApp

Can I install a mezzanine in my industrial shed?

In most cases, yes. We verify the existing floor and structure to determine where to support the pillars and if there is a need for strengthening.

What is the project timeline?

Conventional mezzanines take between two and four weeks from measurement to the issuance of the executive.

Which floor should I choose?

It depends on the load and use: composite slab for offices and heavy loads, wall panel for light areas, metal floor for equipment platforms. The choice is made in the project.

What Our Clients Say

Rating 5.0 ⭐ based on 22 testimonials on Google

"Empresa confiável, profissionais atentos e competentes, recomendo!"

Sara Silva Lima

11 meses atrás • Google Maps

3 of 3

Would you like to leave a testimonial? Visit our page on Google Maps and share your experience with us!

Do you need this service?

Send photos and the location. We reply with scope, schedule and price.